Living/Dining Room: done! (blog post)
- paint walls (done 5/2012)
- remove flat screen TV brackets, mounting, and wiring (done 4/2012)
- install recessed lights/repair ceiling (done 4/2012)
- paint shutters
- area rug (done 6/2013)
Kitchen: all done! Dec. 2014 (blog post)
- install new recessed lights; remove old spot lights/repair ceiling (done 4/2012)
- remove door between kitchen and living room (done 4/2012)
- paint walls
- remove wall between kitchen and living room
- create island between two rooms
- remove small pantry
- create large walk-in pantry
- build/continue cabinets along front wall
- add upper shelves to wall on right
- move refrigerator
- move microwave
- move/replace dishwasher
- new oven and gas range
- new cabinets
- new sink
- new counter tops
- remove vinyl floors and replace with tile
- install wood cubbies and shelves in mud room
- paint shutters on windows
Entry/Halls: target completion: 2014 (blog post)
- paint entry walls (done 5/2012)
- remove vinyl floors and replace with tile (done 12/2015)
- paint shutters
- paint hallways
Hall bath: done! (blog post)
- remove all tile, flooring, wallpaper, counter top, hardware (done 3/2012)
- new floor tiles (done 4/2012)
- new shower tiles with border (done 4/2012)
- get tub refinished (done 5/2012)
- new counter top (done 4/2012)
- new sink/faucet (done 4/2012)
- new cabinet fronts (done 4/2012)
- new toilet (done 4/2012)
- new hardware (done 4/2012)
- new mirror (done 4/2012)
- texture/paint walls (done 4/2012)
- new lighting/repair holes from old lighting (done 4/2012)
- frame/hang new pictures (done 4/2012)
- paint shutters
Kids' room: done! (blog post)
- repair/replace sliding closet doors (done 3/2012)
- install ceiling fan with light (done 3/2012)
- paint walls (done 5/2012)
- paint shutters
- twin bed for Claire; bedding, etc. (done 11/2013)
- wall decor (done 5/2012)
Guest room: done! (well, almost) (blog post)
- install ceiling fan with light (done 4/2012)
- repair/replace closet door (done 5/2014)
- paint doors to match room (done 5/2012)
- paint shutters white
Guest bath: done! (blog post)
- remove all tile, flooring, wallpaper, toilet, vanity, sink, shower (done 3/2012)
- remove/repair 2 ft. bulkhead above shower (done 3/2012)
- new floor tiles (done 4/2012)
- new shower walls, tile, border (done 4/2012)
- install new plumbing and fixtures (done 4/2012)
- install new vanity/sink (done 4/2012)
- install vent (done 4/2012)
- new cabinet fronts (done 4/2012)
- new toilet (done 4/2012)
- new hardware (done 4/2012)
- new mirror (done 4/2012)
- install/paint bead board on walls (done 4/2012)
- paint upper walls, door, and ceiling (done 4/2012)
- new lighting/repair holes from old lighting (done 4/2012)
- frame/hang new pictures (done 4/2012)
- new shower door (done 4/2012)
- paint shutters
Family room/Den: done!
- remove wet bar, sink, and cab plumbing (done 4/2012)
- build closet with coat bar and shelf (done 4/2012)
- install new handles on closet doors (done 5/2012)
- fix/fill gap in wood floors
- frame/hang pictures (done 5/2012)
Master bedroom: done! (blog post)
- remove built-in cabinets, repair wall (done 3/2012)
- install carpet in footprint of removed cabinets (done 3/2012)
- remove built-in lights and plugs in back wall (done 3/2012)
- repair/replace recessed lighting (done 4/2012)
- install ceiling fan (done 4/2012)
- paint walls (done 4/2012)
- hang art/frames (done 5/2012)
Master bath: done! (blog post)
- remove carpet from sink area (done 3/2012)
- install new flooring tile (done 3/2012)
- remove tub (done 3/2012)
- remove tile floor and walls around tub/shower area (done 3/2012)
- install new tub; built bench around back (done 4/2012)
- remove glass block window (done 4/2012)
- install new window, build frame (done 4/2012)
- remove old shower tiles, toilet, and wall between (done 3/2012)
- build shower and bench; tile (done 3/2012)
- install shower door (done 4/2012)
- install new recessed lights above sink (done 3/2012)
- replace/remove lights around tub area, repair wall (done 3/2012)
- paint walls (done 4/2012)
- install new hardware (done 4/2012)
- install new cabinets in toilet area (done 4/2012)
- install new toilet (done 4/2012)
- new cabinet fronts in sink area
- paint wood frame around sink area
- hang art (done 5/2012)
Laundry: done!
- repair/replace wall behind washer (done 3/2012)
- fix leak in pipes behind washer (done 3/2012)
- install new tile flooring (done 3/2012)
- paint walls (done 4/2012)
- install shelf above washer/dryer (done 3/2012)
- install hooks
Sunroom: target completion: unknown
- new desk with storage for JP
- new desk chair (done)
Outdoors: target completion: summer 2012
- install outdoor lights in back
- landscaping (started 3/2012)
- install bench swing in front
- install pool cover (done 5/2013)